Energy assets in Germany
9,509 tracked assets, largest first. Country overview →
Germany generation mix by capacity
- wind50.6 GW31.4%
- solar38.0 GW23.6%
- gas30.4 GW18.9%
- coal28.3 GW17.6%
- hydro7.2 GW4.5%
- bioenergy4.1 GW2.6%
- Other2.2 GW1.4%
Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.
Capacity built per year
161.0 GW operating across 10,550 tracked assets, 4.1 GW under construction · last five years up 87% on the five before.
Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 41 MW is under construction with no stated completion year. 2.0 GW of operating capacity has no commissioning year and sits outside the curve. 9 assets have an announced retirement date; closures are not otherwise tracked, so no net-capacity line is drawn.
88% of Germany’s tracked capacity has an owner recorded.
| Asset | Capacity | Owner |
|---|---|---|
| GM Gemmingen Anlagenteil solar farm | 4.9 MW | — |
| Grau Green Energy Osterrönfeld solar project | 4.9 MW | Grau Gewerbeimmobilien Deutschland Nr. 2 GmbH |
| Hillwood Falkensee solar project | 4.9 MW | Greeno Solarprojekt 40 GmbH |
| Offingen I solar farm | 4.9 MW | EMA Energieagentur für Messung und Abrechnung |
| PV Allersberg solar project | 4.9 MW | PV Allersberg GmbH |
| PV Kraftwerk Königsbrück solar farm | 4.9 MW | Sonnenwerk GmbH |
| PV Staßfurt solar farm | 4.9 MW | PV Staßfurt GmbH & Co. KG |
| PVA Bremerhaven solar project | 4.9 MW | Pro Solar GmbH |
| PVA Burg Stargard solar farm | 4.9 MW | Wattner SunAsset Solarkraftwerk 055 GmbH |
| PVA Harbke 1 solar farm | 4.9 MW | Wattner SunAsset Solarkraftwerk 022 GmbH & Co. KG |
| PVA ILM solar project | 4.9 MW | Solaranlagenbau Sachsen GmbH |
| PVA Kleinaitingen II solar farm | 4.9 MW | MKM Solar Invest 2 GmbH |
| PVA Leutkirch I solar farm | 4.9 MW | Solarpark Leutkirch GmbH & Co. KG |
| PVA Magdeburg solar farm | 4.9 MW | PACE Photovoltaik 2 GmbH |
| PVA Pasewalk solar farm | 4.9 MW | ENERPARC Solar Invest 94 GmbH |
| PVA Sennewitz 1 solar farm | 4.9 MW | Wattner SunAsset Solarkraftwerk 053 GmbH & Co. KG |
| PVA Thürkow solar farm | 4.9 MW | SolarProjekt-Entwicklungsgesellschaft mbH |
| PVAnlage Nordhalle solar farm | 4.9 MW | P&W Solar Nord GmbH & Co. KG |
| PVF Ebern Heubach solar farm | 4.9 MW | CEE PVF Ebern Heubach GmbH & Co. KG |
| SKW Solarkraftwerk Eberswalde solar farm | 4.9 MW | SKW Solarkraftwerk Eberswalde |
| Schierling I solar farm | 4.9 MW | EMA Energieagentur für Messen & Abrechnen UG (haftungsbeschränkt) & Co. Betriebs KG |
| Solarkraftwerk Püttlingen solar farm | 4.9 MW | Neustromland Projekt 2 GmbH |
| Solarpark Diedrichshagen solar farm | 4.9 MW | Solarpark Diedrichshagen GmbH & Co. KG |
| Solarpark Granheim II BA 2 solar farm | 4.9 MW | Solarpark Granheim GmbH & Co. KG |
| Solarpark Hasloch GmbH & Co. KG solar farm | 4.9 MW | Solarpark Hasloch GmbH & Co. KG |
| Solarpark Hitzelsberg Teil 2 solar project | 4.9 MW | Solarpark Hitzelsberg GmbH & Co. KG |
| Solarpark Lonnerstadt solar project | 4.9 MW | Bürgersolarpark Lonnerstadt GmbH & Co. KG |
| Solarpark Scheinfeld 2 solar farm | 4.9 MW | Anumar Solarpark Scheinfeld GmbH & Co. KG |
| Solarpark Schelklingen solar farm | 4.9 MW | Solarpark Schelklingen GmbH & Co. KG |
| Solarpark1 solar farm | 4.9 MW | Wieser Energie GmbH & Co. KG |
| Trogen 1.7 solar farm | 4.9 MW | ENERPARC Solar Invest 119 GmbH |
| Anlage 1 II solar farm | 4.8 MW | Kurpfalz Naturstrom |
| Egg I solar farm | 4.8 MW | PV NordStrom Eggebek II GmbH & Co. KG |
| Egg XI solar farm | 4.8 MW | PV NordStrom Eggebek II GmbH & Co. KG |
| Eggesin 1.2 solar farm | 4.8 MW | ENERPARC Solar Invest 181 GmbH |
| EngelbrechtsmünsterII solar project | 4.8 MW | HOGA Solarpark GmbH & Co. KG |
| FPV Kesseläcker Erlach solar project | 4.8 MW | Bürgerenergie Kesseläcker GmbH & Co. KG |
| Gardelegen 1 solar farm | 4.8 MW | ENERPARC Solar Invest 123 GmbH |
| Groß Behnitz 1 solar farm | 4.8 MW | mdp GmbH & Co. PV Groß Behnitz KG |
| Harburg 1.2 solar project | 4.8 MW | pvwerk Solar Invest 13 GmbH |
| Heimberg Mitte solar farm | 4.8 MW | — |
| PAM 2 solar farm | 4.8 MW | PAM 2 GmbH & Co. KG |
| PAM 4 GmbH & Co. KG solar farm | 4.8 MW | PAM 4 GmbH & Co. KG |
| PAM 5 GmbH & Co. KG solar farm | 4.8 MW | PAM 5 GmbH & Co. KG |
| PAM 6 GmbH & Co. KG solar farm | 4.8 MW | PAM 6 GmbH & Co. KG |
| PV Anlage Steinhilben solar project | 4.8 MW | Solarpark Steinhilben GmbH |
| PV Burgweisach solar farm | 4.8 MW | Windwärts Sonne GmbH & Co. Projekt Burgweisach KG |
| PV Rietzneuendorf solar farm | 4.8 MW | PV Rietzneuendorf-Staakow GmbH & Co. KG |
| PV Stopfenheim solar project | 4.8 MW | N-ERGIE Sonne und Wind GmbH & Co. KG |
| PVA BT 350 solar farm | 4.8 MW | Porsche Leipzig GmbH |
| PVA Egling solar farm | 4.8 MW | VSP 32 GmbH & Co. KG |
| PVA Glesien solar farm | 4.8 MW | Lighthouse Solar Invest 1 GmbH |
| PVA Hardheim Nord solar farm | 4.8 MW | EVH Grüne Energie-Projekt 2 GmbH&CO.KG |
| PVA Karstädt 2 EEG solar farm | 4.8 MW | CEE PVF Karstädt GmbH & Co.KG |
| PVA Wiesenena solar farm | 4.8 MW | ENERPARC Solar Invest 57 GmbH |
| PVA2 Kerkhofen solar project | 4.8 MW | SRE PV Kerkhofen GmbH & Co. KG |
| Qair SP Jacobsdorf I solar project | 4.8 MW | Qair Solarpark Jacobsdorf GmbH & Co. KG |
| Rossberg Energie solar farm | 4.8 MW | Rossberg Energie GmbH & Co. KG |
| SKW Haldensleben solar farm | 4.8 MW | Innosun GmbH |
| SP Absberg solar farm | 4.8 MW | Solarpark Absberg GmbH & Co. KG |
| SP Boock solar farm | 4.8 MW | Pro Solar GmbH |
| Seßlach II solar farm | 4.8 MW | LHI SolarWind PV Portfolio 2407 GmbH & Co. KG |
| Solarpark Amberg Süd solar project | 4.8 MW | Solarpark Amberg Süd GmbH & Co. KG |
| Solarpark Döggingen solar project | 4.8 MW | Elektrizitätswerke Schönau Energie GmbH |
| Solarpark Heiligenhafen Ia solar farm | 4.8 MW | Sonnenenergie Osterhof 24 GmbH & Co. KG |
| Solarpark Vestenbergsgreuth II solar farm | 4.8 MW | Solarpark Vestenbergsgreuth GmbH & Co. KG |
| Voerde Halle 1 solar project | 4.8 MW | RheinEnergie AG |
| Insheim geothermal power plant | 4.8 MW | — |
| ABO Wind PV WaldMichelbach solar farm | 4.7 MW | GGEW SP Wald-Michelbach GmbH & Co. KG |
| Angersdorf 1.3.A solar farm | 4.7 MW | ENERPARC Solar Invest 255 TU 11 GmbH |
| BürgerSolarpark Mäderhof solar project | 4.7 MW | OstalbBürger Energie eG |
| Denklingen solar project | 4.7 MW | Solar Project 25 GmbH & Co KG |
| Dexion solar project | 4.7 MW | GSC Solar 2 |
| Egg III solar farm | 4.7 MW | PV NordStrom Eggebek II GmbH & Co. KG |
| Egg IV solar farm | 4.7 MW | PV NordStrom Eggebek II GmbH & Co. KG |
| Egg XII solar farm | 4.7 MW | PV NordStrom Eggebek II GmbH & Co. KG |
| Hochstadt Obersdorf 2 solar farm | 4.7 MW | ENERPARC Solar Invest 130 GmbH |
| MONDAS GrundstücksVerwaltungsgesellschaft mbH solar farm | 4.7 MW | MONDAS Grundstücks-Verwaltungsgesellschaft mbH |
| Milmesberg (FFAV) solar farm | 4.7 MW | Solarpark Zerre IV GmbH & Co KG |
| PV Holzgünz solar farm | 4.7 MW | STAWAG Solar GmbH |
| PV UW Homfeld solar project | 4.7 MW | 1. SES PV-Betriebs GmbH & Co. KG |
| PV Verdion solar farm | 4.7 MW | enercity Solarpark Bemerode GmbH & Co. KG |
| PVA Bernburg 1.1 solar farm | 4.7 MW | ENERPARC Solar Invest 65 GmbH |
| PVA Greußen solar farm | 4.7 MW | SolarWind Projekte GmbH |
| PVA Ladenburger Industriestraße solar project | 4.7 MW | Ladenburger GmbH |
| PVA Pirmasens solar farm | 4.7 MW | ST Solarinvestitionsgesellschaft Süd-West mbH & Co.KG |
| PVAnlage Sergen III solar farm | 4.7 MW | — |
| Photovoltaikkraftwerk Töpchin GmbH & Co. KG solar farm | 4.7 MW | LSSI Leadership Solar Invest 4 GmbH & Co. KG |
| Phönix Petersberg 2 solar farm | 4.7 MW | EVH Grüne Energie - Projekt 1 GmbH & Co. KG |
| RCP Solarpark Fürstenwalde solar farm | 4.7 MW | RCP Solarpark Fürstenwalde GmbH & Co. KG |
| SKW Dörverden solar farm | 4.7 MW | SKW Dörverden |
| SKW IRT III solar farm | 4.7 MW | Regionalwerke Trier Saarburg AöR |
| SKW Thunpadel 1 solar farm | 4.7 MW | Thunpadel Netzbetreibergesellschaft GmbH |
| SP Breitungen Grumbachaue solar farm | 4.7 MW | SINNVEST PVK Portfolio GmbH & Co. KG |
| SP Gefrees solar farm | 4.7 MW | Solarpark Gefrees GmbH & Co. KG |
| SP Möringen II PVA6 solar project | 4.7 MW | MSE Solarpark Möringen GmbH & Co. KG |
| Solarpark Bockelwitz solar farm | 4.7 MW | Chorus CleanTech GmbH & Co. Solarpark Bockelwitz KG |
| Solarpark Finsterwalde II BA 2b solar farm | 4.7 MW | Energiebauern GmbH & Co. Kraftwerke KG |
| Solarpark Mühlbuck solar farm | 4.7 MW | Solarpark Dinkelsbühl GmbH & Co. KG |
| Solarpark Spreewitz solar farm | 4.7 MW | 2. Sonnenfänger Kraftwerk Solarfarm GmbH & Co. KG |
| Solarpark Vilsbiburg V solar project | 4.7 MW | Bürgerenergie Vilsbiburg Süd II GmbH & Co. KG |
| Solpark Aosta solar farm | 4.7 MW | SPC Solarpark Calvörde GmbH & Co. KG |
| tBen2 PV Benhof 1 Teil 2 solar project | 4.7 MW | Photovoltaikpark Benhof GmbH & Co. KG |
| AurachWahrbergSolar GmbH solar farm | 4.6 MW | Aurach-Wahrberg-Solar GmbH |
| BA1 II solar farm | 4.6 MW | Bife GmbH c/o CLERE AG |
| BSG PV LoRi solar project | 4.6 MW | BürgerSolarGesellschaft (BSG) Saar mbH |
| Ballenstedt I solar farm | 4.6 MW | DM Holding GmbH |
| Bimöhlen 1.2 solar farm | 4.6 MW | EP4 Solar Invest 4 GmbH & Co. KG |
| Eggebek 2.2 solar project | 4.6 MW | ENERPARC Solar Invest 176 GmbH |
| Erzeugungsanlage Dach/Freilandfläche solar farm | 4.6 MW | Inline Rollenoffset Ploch & Strube GmbH |
| FFPVAnlage Arpke solar project | 4.6 MW | Energiegenossenschaft Lehrte-Sehnde eG |
| Grumbachaue BA1 solar farm | 4.6 MW | Solarpark Breitungen GmbH |
| Hillwood Essen Halle 12 solar project | 4.6 MW | ENVIRIA Green Energy 1 GmbH & Co. KG |
| Landsberg 3.2 solar farm | 4.6 MW | ENERPARC Solar Invest 138 GmbH |
| Letschin 2.2 solar farm | 4.6 MW | ENERPARC Solar Invest 125 GmbH |
| Milzau solar farm | 4.6 MW | S+S Solar OHG Milzau |
| PV Artern solar farm | 4.6 MW | PV Artern GmbH & Co. KG |
| PV Ermetzhofen (Teil 2) solar farm | 4.6 MW | Bürgersolar Ermetzhofen GmbH & Co. KG |
| PV FF Örlinger Tal 4.6 MW solar project | 4.6 MW | SWU Energie GmbH |
| PV InzigkofenEngelswies B solar farm | 4.6 MW | EnBW SunInvest GmbH & Co. KG |
| PV-Anlage 18 West, Station A solar project | 4.6 MW | Fraport AG |
| PVA Hörselberg Hainich solar farm | 4.6 MW | Enerparc Solar Invest 41 GmbH |
| PVA Kotzen solar farm | 4.6 MW | EVH Grüne Energie-Projekt 2 GmbH&CO.KG |
| PVA Lauingen II solar farm | 4.6 MW | SolEnergi Bayern ApS & Co. PVA Lauingen II KG |
| PVA Nardt solar farm | 4.6 MW | Wattner SunAsset Solarkraftwerk 051 GmbH & Co. KG |
| PVA Rosswein solar farm | 4.6 MW | ENERPARC Solar Invest 87 GmbH |
| PVA Tiefbrunn Teil 2 solar project | 4.6 MW | FIMA Invest IV UG (haftungsbeschränkt) & Co. KG |
| PVDachanlage Südhalle Industriepark Mamming solar farm | 4.6 MW | Apfelböck GmbH & Co. PV II KG |
| SP Henschleben 2 solar farm | 4.6 MW | NaturStromQuelle Fünf GmbH & Co. KG |
| SP Königsfeld solar project | 4.6 MW | Energiepark SP Königsfeld GmbH & Co. KG |
| Schöli solar farm | 4.6 MW | Schöli GmbH & Co.KG |
| Solarkraftwerk Ahorn Süd solar farm | 4.6 MW | Solarkraftwerk Ahorn GmbH & Co. KG |
| Solarpark Anger solar farm | 4.6 MW | Solarpark Anger GmbH & Co. KG |
| Solarpark Briest V EDIS Anlage solar project | 4.6 MW | Briest-Havelsee GmbH & Co. KG |
| Solarpark Euerwang II solar farm | 4.6 MW | LHI SolarWind PV Euerwang 2290 GmbH & Co. KG |
| Solarpark Hellingen IV solar farm | 4.6 MW | GFG-Solar |
| Solarpark Heusweiler solar project | 4.6 MW | AST Solarkraftwerk 11 GmbH & Co. KG |
| Solarpark Kalchreuth solar project | 4.6 MW | BrEiSch Beerbach GmbH & Co. KG |
| Solarpark PfeffenhausenEgglhausen solar farm | 4.6 MW | Pfeffenhausen-Egglhausen Photovoltaik GmbH |
| Solarpark Rauenberg solar farm | 4.6 MW | Solarpark Rauenberg |
| Solarpark Waldbrunn solar farm | 4.6 MW | FP Lux Solar GmbH & Co. Waldbrunn KG |
| Sonnenpark Tännesberg solar farm | 4.6 MW | Sonnenpark Tännesberg GmbH & Co.KG |
| ZF Thyrnau PVFreiflächenanlage solar project | 4.6 MW | ZF Friedrichshafen AG |
| sUnb1 Deining Unterbuchfeld 1 solar project | 4.6 MW | WP Invest 3 GmbH & Co. KG |
| ECO solar farm | 4.5 MW | ISM Eckolstädt GmbH & Co.KG |
| Energie Park Kirchdorf solar farm | 4.5 MW | terra-dukt Energie Park Kirchdorf GmbH&Co.KG |
| Green City Solarpark Schwerin GmbH & Co. KG I solar farm | 4.5 MW | Solarpark Schwerin GmbH & Co. KG |
| GreizGommla solar farm | 4.5 MW | CHORUS CleanTech GmbH & Co. Solarpark Greiz KG |
| LNE Zuschlag 2 solar project | 4.5 MW | Burgsalach Netz GbR |
| Lauperath 1. Bauabschnitt solar farm | 4.5 MW | Solarpark Lauperath GmbH & Co. KG |
| Mühlhausen solar farm | 4.5 MW | GF Mühlhausen GmbH & Co. KG |
| Nordhausen solar project | 4.5 MW | ENERPARC Solar Invest 239 TU 1 GmbH & Co. KG |
| Oberwesterwaldbahn Elbtal BA2 solar farm | 4.5 MW | Solarpark Pflugdorf GmbH & Co. KG |
| PV Aidhausen solar farm | 4.5 MW | N-ERGIE Sonne und Wind GmbH & Co. KG |
| PV Görike Ball solar farm | 4.5 MW | PV Gumtow GmbH & Co. KG |
| PV Schörghuber solar project | 4.5 MW | Schörghuber Spezialtüren KG |
| PVA Altgolßen solar farm | 4.5 MW | FW Solar GmbH & Co. KG |
| PVA Einbach (EEG) BA II solar project | 4.5 MW | VR-Bank Rottal-Inn eG |
| PVA Elsnigk solar farm | 4.5 MW | ISM Bitterfeld GmbH & Co.KG |
| PVA Fincken solar farm | 4.5 MW | SPP 1 Solar Invest 4 GmbH & Co. KG |
| PVA Gattendorf 1.2 solar farm | 4.5 MW | ENERPARC Solar Invest 80 GmbH |
| PVA Malsch II solar farm | 4.5 MW | Erdgas Südwest GmbH |
| PVA Oberseifersdorf 1 II solar farm | 4.5 MW | ENERPARC Solar Invest 104 GmbH |
| PVA P33 solar project | 4.5 MW | SWS Natur GmbH |
| PVA Solpke 22 solar farm | 4.5 MW | Solarpark R8 UG (haftungsbeschränkt) & Co. KG |
| PVA Tangermünde Teil 2 solar farm | 4.5 MW | FEH Solarpark 35 GmbH & Co. KG |
| PVA Tuningen Solarpark solar farm | 4.5 MW | EnBW Solarpark Weesow-Willmersdorf GmbH |
| PVA VEXX 3 Halle solar farm | 4.5 MW | VEXX-Energy Invest 3 GmbH & Co. KG |
| PVA Weferlingen solar farm | 4.5 MW | MKM Solar Invest 17 GmbH |
| PVA Zschornewitz solar farm | 4.5 MW | Lausitz Energie Verwaltungs GmbH |
| PVAnlage Deponie Mannheim solar project | 4.5 MW | TIB Chemicals AG |
| Parsberg Hörmannsdorf 2 solar farm | 4.5 MW | SPP 1 Solar Invest 12 GmbH & Co. KG |
| Quellenreuth solar farm | 4.5 MW | Solaranlage Quellenreuth GmbH & Co. KG |
| RAGNA Mobilien Verwaltungsgesellschaft mbH West solar farm | 4.5 MW | RAGNA Mobilien-Verwaltungsgesellschaft mbH |
| RCP Solarpark Allstedt III solar farm | 4.5 MW | RCP Solarpark Allstedt GmbH & Co. KG |
| RCP Solarpark Laudenbach II solar farm | 4.5 MW | RCP Solarpark Laudenbach GmbH & Co. KG |
| Relzow Dach NEU solar farm | 4.5 MW | Mewako GmbH |
| SKW Tannroda solar project | 4.5 MW | Solar Construct GmbH |
| Solarpark Fernwald solar farm | 4.5 MW | Solarpark Fernwald |
| Solarpark Finsterwalde II BA 2a solar farm | 4.5 MW | Energiebauern GmbH & Co. Kraftwerke KG |
| Solarpark Gerolfingen/Aufkirchen solar farm | 4.5 MW | Greeno Solarprojekt 18 GmbH & Co. KG |
| Solarpark Kalteneber solar project | 4.5 MW | Stadtwerke Heilbad Heiligenstadt GmbH |
| Solarpark MSP 5 solar project | 4.5 MW | Solarpark MSP5 GmbH & Co. KG |
| Solarpark Polzow Ib solar farm | 4.5 MW | Sonnenenergie Osterhof 21 GmbH & Co. KG |
| Solarpark Siglhof GmbH solar farm | 4.5 MW | Solarpark Siglhof GmbH |
| Solarpark Staig solar farm | 4.5 MW | Solarpark Staig GmbH & Co. KG |
| Solarpark Streitberg solar project | 4.5 MW | next energy projects 2050 GmbH |
| Solarpark Unterrottmannsdorf solar farm | 4.5 MW | Solarpark Unterrottmannsdorf GmbH & Co. KG |
| TWS PV Anlage Boms solar farm | 4.5 MW | Technische Werke Schussental GmbH & Co. KG |
| Treben 1 solar farm | 4.5 MW | Wattner SunAsset Solarkraftwerk 038 GmbH & Co. KG |
| Vogelsbüsch Freiland solar farm | 4.5 MW | Kronberg Objektbauten GmbH |
| Taufkirchen geothermal power plant | 4.5 MW | — |
| Ford Saarlouis power station | 4.4 MW | Ford-Werke GmbH |
| Eggebek 3.2 solar project | 4.4 MW | Sunnic Lighthouse Solar Invest 14 TU 11 GmbH |
| Freiflächenanlage Baerlocher solar project | 4.4 MW | Baerlocher |
| Freiflächenanlage solar project | 4.4 MW | Airport Weeze Renewable Energy GmbH |
| Heinsberg Ausschreibung solar farm | 4.4 MW | SFW Solarinvestitionsgesellschaft 1 mbH & Co. KG |
| Martinsheim solar farm | 4.4 MW | Chronos Solar |
| PV Lettweiler solar project | 4.4 MW | TEP Ceti GmbH & Co.KG |
| PV Nobitz Freiland solar farm | 4.4 MW | Heim Solar Nobitz GmbH & Co. KG |
| PV-Park Goehl solar project | 4.4 MW | HaSpa Solar Invest GmbH & Co. KG |
| PVA Antdorf solar farm | 4.4 MW | VSP 27 GmbH & Co. KG |
| PVA Chemnitz I solar farm | 4.4 MW | Lighthouse Solar Invest 2 GmbH |
| PVA Dahme solar farm | 4.4 MW | CS Solarpark Dahme GmbH |
| PVA Groß Wahrberg 2 solar farm | 4.4 MW | Groß Wahrberg GbR |
| PVA Guben II Teil Ausschreibung solar project | 4.4 MW | FEH Solarpark 34 GmbH & Co. KG |
| PVA Heidelberg Grenzhof solar farm | 4.4 MW | SINNVEST PVK Heidelberg GmbH & Co. KG |
| PVA Mockritz 2 solar farm | 4.4 MW | MKM Solar Invest 10 GmbH |
| PVA Ronneburg I solar farm | 4.4 MW | GLS Solarenergie GmbH & Co. KG |
| PVA Schrattenbach solar farm | 4.4 MW | Solarpark Dietmannsried - Einöde GmbH & Co. KG |
| PVA Unterpreppach solar project | 4.4 MW | BKB Solar 4 GmbH & Co. KG & Martin Heiko GbR |
| PVA Walsrode solar farm | 4.4 MW | PACE Photovoltaik 2 GmbH |
| PVAnlage Standort Coesfeld solar project | 4.4 MW | F+S Milchwerk Coesfeld GmbH |
| PVFreiflächenanlage Neunkirchen II solar farm | 4.4 MW | Sonnenhof II GmbH & Co. KG |
| Pflugdorf solar farm | 4.4 MW | Solarpark Pflugdorf GmbH & Co. KG |
| SP Haselberg solar farm | 4.4 MW | Pro Solar GmbH |
| SP Tegernbach II solar farm | 4.4 MW | SP Tegernbach 102 GmbH & Co. KG |
| Schierling II solar farm | 4.4 MW | EMA Energieagentur für Messen & Abrechnen UG & Co. Betriebs KG |
| Schönermark Stallanlagen solar project | 4.4 MW | Solar Schönermark GmbH |
| Solarkraftwerk Höttingen GmbH & Co. KG solar farm | 4.4 MW | Solarpark Höttingen GmbH & Co. KG |
| Solarkraftwerk Müncherlbach solar farm | 4.4 MW | — |
| Solarpark Albertshausen II solar project | 4.4 MW | TK Sustainable Energy GmbH & Co. KG |
| Solarpark Krempendorf III (Bassenheim) solar farm | 4.4 MW | FP Lux Solar GmbH & Co. Krempendorf KG |
| Solarpark Königsbrück I solar farm | 4.4 MW | BVT Umweltequity Solarpark Königsbrück GmbH & Co. KG |
| Solarpark NeustadtDosse solar farm | 4.4 MW | Sonnenenergie Osterhof IV GmbH & Co. KG |
| Solarpark Pirach Höllthaler solar project | 4.4 MW | PV Pirach GmbH & Co. KG |
| Solarpark Stulln solar farm | 4.4 MW | Solarpark Stulln GmbH & co. KG |
| Solarpark Theilenhofen solar farm | 4.4 MW | — |
| Solarpark Tietelsen solar farm | 4.4 MW | Solarpark Tietelsen |
| Solarpark Tiste Gebiet solar farm | 4.4 MW | NewDev Solarpark Tiste ApS & Co. KG |
| Sottrum H1H4 SM Anlage solar project | 4.4 MW | Logistic Concept GmbH |
| System 001 Helioflux solar project | 4.4 MW | ESB Erneuerbare Energien GmbH |
| TSP Tweelbäke Solarpark GmbH & Co. KG solar farm | 4.4 MW | TSP Tweelbäke Solarpark GmbH & Co. KG |
| Theilheim solar farm | 4.4 MW | — |
| Zahna-West-PPA-Anlage solar project | 4.4 MW | Wattner SunAsset Solarkraftwerk 093 GmbH & Co. KG |
| Albertshausen solar farm | 4.3 MW | Solaranlage Albertshausen GmbH & Co. KG |
| BS 1 solar farm | 4.3 MW | Buchschwabach Solar GbR |
| Barby solar farm | 4.3 MW | ST Solarinvestitionsgesellschaft Sachsen-Anhalt 1 mbH |
| Beuna solar farm | 4.3 MW | SOLSA Solarenergie Sachsen-Anhalt GmbH |
| Bürgersolaranlage Mittleres und Langes Gewand solar farm | 4.3 MW | Bürgersolar Bretzfeld GmbH & Co. KG |
| E.ON Solarpark Herbrechtingen GmbH&Co. KG (EEG-Ausschreibungsteil) solar project | 4.3 MW | E.ON Solar Solutions GmbH |
| EPE 2 solar farm | 4.3 MW | SWHR Solarpark Epenwöhrden UG (haftungsbeschränkt) & Co. KG |
| Elter Iserbebeka solar farm | 4.3 MW | ISM Solar GmbH & Co. KG |
| Freifläche Schöntal solar project | 4.3 MW | Specht GbR |
| Freiflächen PV Rehau solar project | 4.3 MW | nahKRAFT GmbH & Co. KG |
| Freiflächenanlage solar project | 4.3 MW | Lenze Operations GmbH |
| Grassau solar farm | 4.3 MW | EnerGeno Grassau GbR |
| Green City Solarpark Schnabelwaid Nord GmbH & Co KG Süd solar farm | 4.3 MW | Green City Solarpark Schnabelwaid Nord GmbH & Co. KG |
| Harsdorf solar farm | 4.3 MW | K&K Solarpark GbR |
| LHI Solar Deutschland VIII GmbH & Co. KG (PVA Wanzleben) solar farm | 4.3 MW | LHI Solar Deutschland VIII GmbH & Co. KG |