Solar farm

Solarpark Stulln solar farm

Solarpark Stulln solar farm is a solar farm in Germany with a capacity of 4.4 MW, commissioned in 2012. It is operating and is owned by Solarpark Stulln GmbH & co. KG.

In 2024 it settled 3.3 GWh of electricity, a load factor of 8.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2032, after which that output is sold at market prices.

Measured performance vs peers
8.6%
This assetCohort median 10.5%Middle half

This asset produced at 8.6% of nameplate in 2024 — the 13th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
4.4 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
Solarpark Stulln GmbH & co. KG
Technology
PV
Measured output 2024
3.3 GWh
Load factor
8.6%
EEG support ends
2032
Peer percentile
13th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE960799408053); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets