Solar farm

Solarpark Finsterwalde II BA 2b solar farm

Solarpark Finsterwalde II BA 2b solar farm is a solar farm in Germany with a capacity of 4.7 MW, commissioned in 2020. It is operating.

In 2024 it settled 5.2 GWh of electricity, a load factor of 12.6%. That volume was settled under EEG support.

Capacity
4.7 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Technology
PV
Measured output 2024
5.2 GWh
Load factor
12.6%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap