Parsberg Hörmannsdorf 2 solar farm is a solar farm in Germany with a capacity of 4.5 MW, commissioned in 2020. It is operating.
In 2024 it settled 3.0 GWh of electricity, a load factor of 7.6%. It sold essentially all of that volume outside EEG support — it is already merchant.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets