←CapexAtlas|Directory
Directory · Türkiye

Energy assets in Türkiye

3,548 tracked assets, largest first. Country overview →

Türkiye generation mix by capacity

hydro: 26.5 GW (24.9%)gas: 25.5 GW (23.9%)coal: 20.5 GW (19.2%)solar: 16.5 GW (15.5%)wind: 14.0 GW (13.1%)geothermal: 1.9 GW (1.8%)Other: 1.7 GW (1.6%)106.5 GWtotal
  • hydro26.5 GW24.9%
  • gas25.5 GW23.9%
  • coal20.5 GW19.2%
  • solar16.5 GW15.5%
  • wind14.0 GW13.1%
  • geothermal1.9 GW1.8%
  • Other1.7 GW1.6%

Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.

Capacity built per year

BuiltUnder construction

106.5 GW operating across 3,554 tracked assets, 6.7 GW under construction · last five years down 56% on the five before.

2.14.36.48.5GW1990: 302 MW built1991: 662 MW built1992: 2.9 GW built1993: 84 MW built1994: 579 MW built1995: 300 MW built1996: 253 MW built1997: 240 MW built1998: 935 MW built1999: 1.9 GW built2000: 1.0 GW built2001: 823 MW built2002: 3.0 GW built2003: 3.8 GW built2004: 1.1 GW built2005: 1.1 GW built2006: 1.4 GW built2007: 1.1 GW built2008: 614 MW built2009: 1.9 GW built2010: 4.2 GW built2011: 3.4 GW built2012: 2.6 GW built2013: 6.6 GW built2014: 5.3 GW built2015: 4.0 GW built2016: 5.3 GW built2017: 8.5 GW built2018: 5.4 GW built2019: 2.2 GW built2020: 4.7 GW built2021: 1.9 GW built2022: 2.2 GW built2023: 5.0 GW built2024: 2.1 GW built2025: 663 MW built2026: 0 MW built2027: 1.2 GW under construction2028: 1.2 GW under construction19901995200020052010201520202025
Cumulative operating capacity
GW51103
Hover a bar for the year.

Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 2.1 GW is under construction with no stated completion year. 6.4 GW of operating capacity has no commissioning year and sits outside the curve. Retirements are not tracked for this country, so no net-capacity line is drawn.

84% of Türkiye’s tracked capacity has an owner recorded.

AssetCapacityOwner
Erzincan solar project VIII1.3 MW—
Erzurum solar project X1.3 MW—
Erzurum solar project XVI1.3 MW—
Erzurum solar project XVII1.3 MW—
Eskişehir solar project I1.3 MW—
Eskişehir solar project LIII1.3 MW—
Gaziantep solar project VII1.3 MW—
Gaziantep solar project XVIII1.3 MW—
Gülşehir solar project IV1.3 MW—
Hatay solar project II1.3 MW—
Hatay solar project VI1.3 MW—
Isparta solar project III1.3 MW—
Isparta solar project XI1.3 MW—
Isparta solar project XXXIII1.3 MW—
Isparta solar project XXXVII1.3 MW—
Istanbul solar project I1.3 MW—
Istanbul solar project IV1.3 MW—
Istanbul solar project VIII1.3 MW—
Kahramanmaraş solar project XIII1.3 MW—
Kahramanmaraş solar project XVI1.3 MW—
Kahramanmaraş solar project XXI1.3 MW—
Karaman solar project XXIX1.3 MW—
Kayseri solar project LXXXVI1.3 MW—
Kayseri solar project XCIII1.3 MW—
Kayseri solar project XLV1.3 MW—
Konya solar project CLII1.3 MW—
Konya solar project CXI1.3 MW—
Konya solar project CXXXIII1.3 MW—
Kırklareli solar project VI1.3 MW—
Kırşehir solar project I1.3 MW—
Muş solar project IV1.3 MW—
Nevşehir solar project VI1.3 MW—
Niğde solar project XI1.3 MW—
Ordu solar project1.3 MW—
Tekirdağ solar project III1.3 MW—
Tokat solar project XII1.3 MW—
Türkiye solar project CCC1.3 MW—
Türkiye solar project CCLXXXVIII1.3 MW—
Türkiye solar project CCXCII1.3 MW—
Türkiye solar project CCXLI1.3 MW—
Türkiye solar project CCXXV1.3 MW—
Türkiye solar project CCXXXIX1.3 MW—
Türkiye solar project CXLVII1.3 MW—
Türkiye solar project CXV1.3 MW—
Türkiye solar project CXXVI1.3 MW—
Türkiye solar project CXXXVIII1.3 MW—
Türkiye solar project II1.3 MW—
Türkiye solar project III1.3 MW—
Türkiye solar project LV1.3 MW—
Türkiye solar project XX1.3 MW—
Yozgat solar project XIV1.3 MW—
Yozgat solar project XV1.3 MW—
Çankırı solar project XIX1.3 MW—
Çorum solar project III1.3 MW—
Çorum solar project XXII1.3 MW—
Şanlıurfa solar project XXXVIII1.3 MW—
Adana solar project VII1.2 MW—
Adana solar project XXXVI1.2 MW—
Adıyaman solar project XII1.2 MW—
Afyonkarahisar solar project LXXXII1.2 MW—
Afyonkarahisar solar project X1.2 MW—
Afyonkarahisar solar project XCII1.2 MW—
Afyonkarahisar solar project XLIII1.2 MW—
Aliaga Rafinerisi Santrali solar project1.2 MW—
Antalya solar project LIV1.2 MW—
Antalya solar project LVII1.2 MW—
Antalya solar project X1.2 MW—
Antalya solar project XLIX1.2 MW—
Antalya solar project XXXIII1.2 MW—
Aydın solar project XX1.2 MW—
Balıkesir solar project III1.2 MW—
Batman solar project IX1.2 MW—
Bilecik solar project XXIV1.2 MW—
Bitlis solar project XV1.2 MW—
Boren Hybrid solar project1.2 MW—
Bursa solar project XXVII1.2 MW—
Bursa solar project XXXVI1.2 MW—
Denizli solar project XXXII1.2 MW—
Diyarbakır solar project II1.2 MW—
Diyarbakır solar project VIII1.2 MW—
Eglence I Hybrid solar project1.2 MW—
Erzurum solar project XXXI1.2 MW—
Erzurum solar project XXXIII1.2 MW—
Eskisehir Biyogaz Enerji Tesisi solar project1.2 MW—
Eskişehir solar project XI1.2 MW—
Eskişehir solar project XXXI1.2 MW—
Gaziantep solar project LIII1.2 MW—
Gaziantep solar project LV1.2 MW—
Gaziantep solar project LVII1.2 MW—
Giresun solar project II1.2 MW—
Giresun solar project V1.2 MW—
Isparta solar project II1.2 MW—
Isparta solar project LXVI1.2 MW—
Istanbul solar project III1.2 MW—
Izmir solar project V1.2 MW—
Kadirli solar project III1.2 MW—
Kahramanmaraş solar project III1.2 MW—
Kahramanmaraş solar project LXI1.2 MW—
Kahramanmaraş solar project XLV1.2 MW—
Kayseri solar project IV1.2 MW—
Kayseri solar project LXXV1.2 MW—
Kayseri solar project LXXXIX1.2 MW—
Kmk Paper Kutahya Kagit Fabrikasi Kojenerasyon Santrali solar project II1.2 MW—
Konya solar project CXXVIII1.2 MW—
Konya solar project XLIX1.2 MW—
Kütahya Merkez solar project IX1.2 MW—
Kırıkkale solar project XVI1.2 MW—
Manisa solar project VI1.2 MW—
Mersin solar project LII1.2 MW—
Mersin solar project XLII1.2 MW—
Muğla solar project IV1.2 MW—
Muğla solar project VII1.2 MW—
Muğla solar project VIII1.2 MW—
Muğla solar project XL1.2 MW—
Naturel & Esenboğa Energy solar farm1.2 MW—
Osmaniye solar project XII1.2 MW—
Tekirdağ solar project X1.2 MW—
Tekirdağ solar project XVI1.2 MW—
Tokat solar project VI1.2 MW—
Türkiye solar project CCCXII1.2 MW—
Türkiye solar project CCCXXII1.2 MW—
Türkiye solar project CCII1.2 MW—
Türkiye solar project CCLXIV1.2 MW—
Türkiye solar project CCLXXXI1.2 MW—
Türkiye solar project CCXX1.2 MW—
Türkiye solar project CXVII1.2 MW—
Türkiye solar project XCVI1.2 MW—
Türkiye solar project XV1.2 MW—
Uşak solar project XV1.2 MW—
Van solar project VIII1.2 MW—
Yazıçayırı Mahallesi solar project I1.2 MW—
Zonguldak solar project IV1.2 MW—
Çorum solar project XXI1.2 MW—
Çorum solar project XXV1.2 MW—
Greif wind farm1.2 MW—
Sunjüt wind farm1.2 MW—
Adıyaman solar project VI1.1 MW—
Afyonkarahisar solar project XCIII1.1 MW—
Afyonkarahisar solar project XLVI1.1 MW—
Afyonkarahisar solar project XXX1.1 MW—
Afyonkarahisar solar project XXXII1.1 MW—
Aydın solar project III1.1 MW—
Aydın solar project XXVIII1.1 MW—
Balıkesir solar project I1.1 MW—
Balıkesir solar project XI1.1 MW—
Bilecik solar project VIII1.1 MW—
Bilecik solar project XXVI1.1 MW—
Bitlis solar project V1.1 MW—
Bursa solar project XXVI1.1 MW—
Bursa solar project XXVIII1.1 MW—
Denizli solar project LIII1.1 MW—
Denizli solar project LVIII1.1 MW—
Denizli solar project VIII1.1 MW—
Denizli solar project XX1.1 MW—
Denizli solar project XXI1.1 MW—
Denizli solar project XXX1.1 MW—
Derinkuyu solar project III1.1 MW—
Elazığ solar project IX1.1 MW—
Elâzığ solar project VII1.1 MW—
Elâzığ solar project XXII1.1 MW—
Erzincan solar project XIII1.1 MW—
Eskişehir solar project L1.1 MW—
Gaziantep solar project X1.1 MW—
Gaziantep solar project XI1.1 MW—
Gaziantep solar project XII1.1 MW—
Gaziantep solar project XXVI1.1 MW—
Guneykent (Vektor) solar project1.1 MW—
Hatay solar project VII1.1 MW—
Isparta solar project LVI1.1 MW—
Isparta solar project LXIV1.1 MW—
Isparta solar project LXV1.1 MW—
Istanbul solar project VII1.1 MW—
Kahramanmaraş solar project LII1.1 MW—
Kahramanmaraş solar project XII1.1 MW—
Kars solar project VI1.1 MW—
Kayseri solar project II1.1 MW—
Kayseri solar project III1.1 MW—
Kayseri solar project LXIX1.1 MW—
Kayseri solar project LXVII1.1 MW—
Kocaeli solar project I1.1 MW—
Kocaeli solar project XI1.1 MW—
Konya solar project CXXVI1.1 MW—
Konya solar project II1.1 MW—
Konya solar project X1.1 MW—
Konya solar project XLIV1.1 MW—
Kırıkkale solar project I1.1 MW—
Kırşehir solar project XVII1.1 MW—
Mersin solar project III1.1 MW—
Nevşehir solar project III1.1 MW—
Osmaniye solar project III1.1 MW—
Osmaniye solar project XIII1.1 MW—
Sakarya solar project I1.1 MW—
Sakarya solar project II1.1 MW—
Tekirdağ solar project VII1.1 MW—
Turkmenbeyi Hybrid solar project1.1 MW—
Türkiye solar project CCXCI1.1 MW—
Türkiye solar project CCXCV1.1 MW—
Türkiye solar project CCXCVI1.1 MW—
Türkiye solar project CCXII1.1 MW—
Türkiye solar project CCXXXV1.1 MW—
Türkiye solar project CLXXIX1.1 MW—
Türkiye solar project XII1.1 MW—
Uşak solar project II1.1 MW—
Uşak solar project III1.1 MW—
Van solar project XII1.1 MW—
Yapilcanlar2 Hybrid solar project1.1 MW—
Yozgat solar project I1.1 MW—
Yozgat solar project XX1.1 MW—
Çankırı solar project XIV1.1 MW—
Çankırı solar project XXVI1.1 MW—
Çorum solar project X1.1 MW—
Şanlıurfa solar project III1.1 MW—
Şırnak solar project I1.1 MW—
Adıyaman solar project XXXI1 MW—
Afyonkarahisar solar project III1 MW—
Afyonkarahisar solar project LXXVIII1 MW—
Antalya solar project XXVI1 MW—
Ardahan solar project II1 MW—
Atlas Termik Santrali solar project1 MW—
Aydın solar project XI1 MW—
Aydın solar project XXIV1 MW—
Bitlis solar project XII1 MW—
Burdur solar project III1 MW—
Burdur solar project VIII1 MW—
Burdur solar project XXVI1 MW—
Bursa solar project XVII1 MW—
Canakkale solar project X1 MW—
Canakkale solar project XX1 MW—
Denizli solar project I1 MW—
Denizli solar project LXV1 MW—
Denizli solar project LXVI1 MW—
Diyarbakır solar project XVI1 MW—
Düzce solar project VI1 MW—
Elazığ solar project XIII1 MW—
Elazığ solar project XIV1 MW—
Erzurum solar project I1 MW—
Eskişehir solar project LII1 MW—
Eskişehir solar project LV1 MW—
Eskişehir solar project XXIX1 MW—
Eskişehir solar project XXV1 MW—
Eskişehir solar project XXVI1 MW—
Kahramanmaraş solar project II1 MW—
Kahramanmaraş solar project LVI1 MW—
Kahramanmaraş solar project XXIX1 MW—
Karaman solar project XX1 MW—
Kayseri solar project XCII1 MW—
Kayseri solar project XCVI1 MW—
Kocaeli solar project IV1 MW—
Kocaeli solar project V1 MW—
Kocaeli solar project XV1 MW—
Türkiye energy assets — page 14 · CapexAtlas