←CapexAtlas|Directory
Directory · Türkiye

Energy assets in Türkiye

3,548 tracked assets, largest first. Country overview →

Türkiye generation mix by capacity

hydro: 26.5 GW (24.9%)gas: 25.5 GW (23.9%)coal: 20.5 GW (19.2%)solar: 16.5 GW (15.5%)wind: 14.0 GW (13.1%)geothermal: 1.9 GW (1.8%)Other: 1.7 GW (1.6%)106.5 GWtotal
  • hydro26.5 GW24.9%
  • gas25.5 GW23.9%
  • coal20.5 GW19.2%
  • solar16.5 GW15.5%
  • wind14.0 GW13.1%
  • geothermal1.9 GW1.8%
  • Other1.7 GW1.6%

Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.

Capacity built per year

BuiltUnder construction

106.5 GW operating across 3,554 tracked assets, 6.7 GW under construction · last five years down 56% on the five before.

2.14.36.48.5GW1990: 302 MW built1991: 662 MW built1992: 2.9 GW built1993: 84 MW built1994: 579 MW built1995: 300 MW built1996: 253 MW built1997: 240 MW built1998: 935 MW built1999: 1.9 GW built2000: 1.0 GW built2001: 823 MW built2002: 3.0 GW built2003: 3.8 GW built2004: 1.1 GW built2005: 1.1 GW built2006: 1.4 GW built2007: 1.1 GW built2008: 614 MW built2009: 1.9 GW built2010: 4.2 GW built2011: 3.4 GW built2012: 2.6 GW built2013: 6.6 GW built2014: 5.3 GW built2015: 4.0 GW built2016: 5.3 GW built2017: 8.5 GW built2018: 5.4 GW built2019: 2.2 GW built2020: 4.7 GW built2021: 1.9 GW built2022: 2.2 GW built2023: 5.0 GW built2024: 2.1 GW built2025: 663 MW built2026: 0 MW built2027: 1.2 GW under construction2028: 1.2 GW under construction19901995200020052010201520202025
Cumulative operating capacity
GW51103
Hover a bar for the year.

Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 2.1 GW is under construction with no stated completion year. 6.4 GW of operating capacity has no commissioning year and sits outside the curve. Retirements are not tracked for this country, so no net-capacity line is drawn.

84% of Türkiye’s tracked capacity has an owner recorded.

AssetCapacityOwner
Konya solar project C1 MW—
Konya solar project CLIII1 MW—
Konya solar project CXLI1 MW—
Konya solar project CXLIV1 MW—
Konya solar project CXXV1 MW—
Konya solar project CXXXII1 MW—
Konya solar project III1 MW—
Konya solar project LXXVII1 MW—
Konya solar project XXIV1 MW—
Konya solar project XXVIII1 MW—
Kırıkkale solar project X1 MW—
Malatya solar project V1 MW—
Manisa solar project XI1 MW—
Mardin solar project I1 MW—
Mersin solar project XLIV1 MW—
Muğla solar project X1 MW—
Muğla solar project XXXIV1 MW—
Muğla solar project XXXVI1 MW—
Niğde solar project III1 MW—
Niğde solar project XXXI1 MW—
Samsun solar project VIII1 MW—
Seymen Enerji Uretim Tesisi solar project1 MW—
Sivas solar project XXI1 MW—
Türkiye solar project CCCXXI1 MW—
Türkiye solar project CCLXXIII1 MW—
Türkiye solar project CCLXXIX1 MW—
Türkiye solar project CCLXXXII1 MW—
Türkiye solar project CCXC1 MW—
Türkiye solar project CXXII1 MW—
Türkiye solar project LXXXIII1 MW—
Uşak solar project XXV1 MW—
Van solar project XIV1 MW—
Yozgat solar project III1 MW—
Yozgat solar project XIX1 MW—
Çorum solar project XXXI1 MW—
Şanlıurfa solar project I1 MW—
Şanlıurfa solar project VI1 MW—
Bati-Raman Oil Field (Türkiye)——
Raman Oil Field (Türkiye)——
Sakarya 1 Gas Phase (Türkiye)——
Sakarya Gas Field (Türkiye)——
Sehit Aybuke Yalcin Oil Field (Türkiye)——
Sehit Esma Cevik Oil Field (Türkiye)——
Dörtyol FSRU—BOTAŞ
Etki FSRU——
Gulf of Saros FSRU—BOTAŞ
Izmir Aliaga LNG Terminal——
Marmara LNG Terminal—BOTAŞ
Türkiye energy assets — page 15 · CapexAtlas