Energy assets in Türkiye

3,548 tracked assets, largest first. Country overview →

Türkiye generation mix by capacity

hydro: 26.5 GW (24.9%)gas: 25.5 GW (23.9%)coal: 20.5 GW (19.2%)solar: 16.5 GW (15.5%)wind: 14.0 GW (13.1%)geothermal: 1.9 GW (1.8%)Other: 1.7 GW (1.6%)106.5 GWtotal
  • hydro26.5 GW24.9%
  • gas25.5 GW23.9%
  • coal20.5 GW19.2%
  • solar16.5 GW15.5%
  • wind14.0 GW13.1%
  • geothermal1.9 GW1.8%
  • Other1.7 GW1.6%

Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.

Capacity built per year

BuiltUnder construction

106.5 GW operating across 3,554 tracked assets, 6.7 GW under construction · last five years down 56% on the five before.

2.14.36.48.5GW1990: 302 MW built1991: 662 MW built1992: 2.9 GW built1993: 84 MW built1994: 579 MW built1995: 300 MW built1996: 253 MW built1997: 240 MW built1998: 935 MW built1999: 1.9 GW built2000: 1.0 GW built2001: 823 MW built2002: 3.0 GW built2003: 3.8 GW built2004: 1.1 GW built2005: 1.1 GW built2006: 1.4 GW built2007: 1.1 GW built2008: 614 MW built2009: 1.9 GW built2010: 4.2 GW built2011: 3.4 GW built2012: 2.6 GW built2013: 6.6 GW built2014: 5.3 GW built2015: 4.0 GW built2016: 5.3 GW built2017: 8.5 GW built2018: 5.4 GW built2019: 2.2 GW built2020: 4.7 GW built2021: 1.9 GW built2022: 2.2 GW built2023: 5.0 GW built2024: 2.1 GW built2025: 663 MW built2026: 0 MW built2027: 1.2 GW under construction2028: 1.2 GW under construction19901995200020052010201520202025
Cumulative operating capacity
GW51103
Hover a bar for the year.

Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 2.1 GW is under construction with no stated completion year. 6.4 GW of operating capacity has no commissioning year and sits outside the curve. Retirements are not tracked for this country, so no net-capacity line is drawn.

84% of Türkiye’s tracked capacity has an owner recorded.

AssetCapacityOwner
Sivas solar project XI1.7 MW—
Sivas solar project XII1.7 MW—
Sivas solar project XIX1.7 MW—
Sivas solar project XXII1.7 MW—
Tekirdağ solar project XVII1.7 MW—
Tunceli solar project I1.7 MW—
Türkiye solar project CLXXI1.7 MW—
Türkiye solar project CXXIII1.7 MW—
Türkiye solar project XIV1.7 MW—
Uşak solar project XXXIII1.7 MW—
Uşak solar project XXXV1.7 MW—
Van solar project III1.7 MW—
Yozgat solar project V1.7 MW—
Yozgat solar project XXI1.7 MW—
Çankırı solar project II1.7 MW—
Çankırı solar project X1.7 MW—
Çankırı solar project XV1.7 MW—
Çorum solar project XX1.7 MW—
Şanlıurfa solar project XXIV1.7 MW—
Şanlıurfa solar project XXXIX1.7 MW—
Adıyaman solar project IV1.6 MW—
Afyonkarahisar solar project LI1.6 MW—
Afyonkarahisar solar project LXVIII1.6 MW—
Afyonkarahisar solar project XXV1.6 MW—
Aksaray solar project XII1.6 MW—
Antalya solar project LXIV1.6 MW—
Antalya solar project XL1.6 MW—
Antalya solar project XLI1.6 MW—
Antalya solar project XXXVII1.6 MW—
Antalya solar project XXXVIII1.6 MW—
Aydın solar project XXIX1.6 MW—
Aydın solar project XXVII1.6 MW—
Bbr Konya Enerji Uretim Tesisii solar project1.6 MW—
Bingöl solar project III1.6 MW—
Biyosan Hybrid solar project1.6 MW—
Bozkir Hybrid solar project1.6 MW—
Burdur solar project XV1.6 MW—
Denizli solar project XLI1.6 MW—
Denizli solar project XLV1.6 MW—
Dinek Mahallesi solar project1.6 MW—
Diyarbakır solar project VII1.6 MW—
Diyarbakır solar project X1.6 MW—
Düzce solar project I1.6 MW—
Düzce solar project IV1.6 MW—
Edirne solar project VII1.6 MW—
Elazığ solar project X1.6 MW—
Elâzığ solar project XXIV1.6 MW—
Erzincan solar project IX1.6 MW—
Eskişehir solar project LIX1.6 MW—
Eskişehir solar project XLI1.6 MW—
Isparta solar project LV1.6 MW—
Izmir solar project I1.6 MW—
Karaman solar project XXXI1.6 MW—
Kayseri solar project XVI1.6 MW—
Kayseri solar project XXXIX1.6 MW—
Kayseri solar project XXXVIII1.6 MW—
Kilis solar project VII1.6 MW—
Kocaeli solar project III1.6 MW—
Konya solar project CXLVI1.6 MW—
Konya solar project LVI1.6 MW—
Konya solar project LXXXV1.6 MW—
Mardin solar project IV1.6 MW—
Mardin solar project IX1.6 MW—
Mersin solar project V1.6 MW—
Mersin solar project XXIII1.6 MW—
Muğla solar project III1.6 MW—
Nevşehir solar project XVIII1.6 MW—
Nevşehir solar project XX1.6 MW—
Niğde solar project XXXII1.6 MW—
Samsun solar project V1.6 MW—
Samsun solar project XIII1.6 MW—
Tekirdağ solar project IV1.6 MW—
Tokat solar project IX1.6 MW—
Türkiye solar project CCLX1.6 MW—
Türkiye solar project CCXIII1.6 MW—
Türkiye solar project CCXLVI1.6 MW—
Türkiye solar project CLXI1.6 MW—
Türkiye solar project CXVIII1.6 MW—
Türkiye solar project LXI1.6 MW—
Türkiye solar project LXXVI1.6 MW—
Türkiye solar project VIII1.6 MW—
Türkiye solar project XCIX1.6 MW—
Türkiye solar project XXVI1.6 MW—
Uregen Enerji Biyogaz Tesisi solar project1.6 MW—
Uşak solar project XXVII1.6 MW—
Uşak solar project XXXVI1.6 MW—
Yozgat solar project XI1.6 MW—
Yozgat solar project XXV1.6 MW—
Yozgat solar project XXVI1.6 MW—
Yozgat solar project XXXI1.6 MW—
Çankırı solar project XX1.6 MW—
Çankırı solar project XXIV1.6 MW—
Çorum solar project XXVIII1.6 MW—
Adana solar project XII1.5 MW—
Adıyaman solar project XXVIII1.5 MW—
Afyonkarahisar solar project XCVI1.5 MW—
Afyonkarahisar solar project XXI1.5 MW—
Aksaray solar project II1.5 MW—
Antalya solar project LII1.5 MW—
Antalya solar project LXIII1.5 MW—
Antalya solar project VIII1.5 MW—
Antalya solar project XI1.5 MW—
Antalya solar project XLIII1.5 MW—
Aydın solar project V1.5 MW—
Balıkesir solar project XIV1.5 MW—
Balıkesir solar project XVI1.5 MW—
Balıkesir solar project XXI1.5 MW—
Batman solar project I1.5 MW—
Burdur solar project XII1.5 MW—
Bursa solar project IX1.5 MW—
Denizli solar project LI1.5 MW—
Dharma Biogaz solar project1.5 MW—
Dumanoglu Hybrid solar project1.5 MW—
Düzce solar project III1.5 MW—
Elâzığ solar project XVIII1.5 MW—
Erzurum solar project XIII1.5 MW—
Eskişehir solar project LIV1.5 MW—
Eskişehir solar project LVII1.5 MW—
Eskişehir solar project XXXIII1.5 MW—
Gaziantep solar project LVI1.5 MW—
Gaziantep solar project XLVIII1.5 MW—
Gaziantep solar project XXXVIII1.5 MW—
Isparta solar project XXXV1.5 MW—
Kadirli solar project I1.5 MW—
Kahramanmaraş solar project LIII1.5 MW—
Kahramanmaraş solar project XLII1.5 MW—
Kahramanmaraş solar project XLIII1.5 MW—
Kahramanmaraş solar project XLIX1.5 MW—
Kahramanmaraş solar project XLVIII1.5 MW—
Karakuz Baraji ve Hybrid solar project1.5 MW—
Karaman solar project IV1.5 MW—
Karaman solar project V1.5 MW—
Karaman solar project XVII1.5 MW—
Kars solar project IV1.5 MW—
Kayseri solar project LXXVIII1.5 MW—
Kayseri solar project XIII1.5 MW—
Kocaeli solar project IX1.5 MW—
Kocaeli solar project VI1.5 MW—
Kocaeli solar project VII1.5 MW—
Kocaeli solar project VIII1.5 MW—
Konya solar project CIV1.5 MW—
Konya solar project CXIX1.5 MW—
Konya solar project CXLIX1.5 MW—
Konya solar project CXXIX1.5 MW—
Konya solar project LV1.5 MW—
Konya solar project LXXXIX1.5 MW—
Konya solar project XLII1.5 MW—
Konya solar project XXII1.5 MW—
Kütahya Merkez solar project XIII1.5 MW—
Kırıkkale solar project XX1.5 MW—
Mersin solar project VIII1.5 MW—
Mersin solar project XIV1.5 MW—
Mersin solar project XIX1.5 MW—
Mersin solar project XXV1.5 MW—
Muğla solar project XV1.5 MW—
Nevşehir solar project XIII1.5 MW—
Sakarya solar project VI1.5 MW—
Samsun solar project VII1.5 MW—
Türkiye solar project CCLV1.5 MW—
Türkiye solar project CCLXXII1.5 MW—
Türkiye solar project CCXLIII1.5 MW—
Türkiye solar project CLIV1.5 MW—
Türkiye solar project LXXVIII1.5 MW—
Türkiye solar project XLV1.5 MW—
Zonguldak solar project I1.5 MW—
Çanakkale Merkez solar project IV1.5 MW—
Çankırı solar project XVIII1.5 MW—
Çorum solar project XXXV1.5 MW—
Adana solar project I1.4 MW—
Adana solar project IX1.4 MW—
Adana solar project XXXV1.4 MW—
Afyonkarahisar solar project V1.4 MW—
Afyonkarahisar solar project XXIII1.4 MW—
Aksaray solar project IV1.4 MW—
Aksaray solar project XVIII1.4 MW—
Amasya solar project XV1.4 MW—
Aydın solar project XII1.4 MW—
Batman solar project VI1.4 MW—
Bayra Regulatoru ve Hybrid solar project1.4 MW—
Burdur solar project VI1.4 MW—
Burdur solar project XIV1.4 MW—
Bursa solar project VI1.4 MW—
Bursa solar project XXX1.4 MW—
Bursa solar project XXXIII1.4 MW—
Bursa solar project XXXV1.4 MW—
Canakkale solar project XIII1.4 MW—
Dalaman I-Ii-Iii-Iv-V Hybrid solar project1.4 MW—
Denizli solar project XLVI1.4 MW—
Denizli solar project XXXV1.4 MW—
Elâzığ solar project III1.4 MW—
Elâzığ solar project IV1.4 MW—
Erzurum solar project XXXII1.4 MW—
Eskişehir solar project LVI1.4 MW—
Eskişehir solar project XLVI1.4 MW—
Greenway Mersin Tower CSP solar farm1.4 MW—
Hatay solar project IV1.4 MW—
Kadirli solar project IV1.4 MW—
Karaman solar project VII1.4 MW—
Kayseri solar project LI1.4 MW—
Kayseri solar project XX1.4 MW—
Kayseri solar project XXI1.4 MW—
Kayseri solar project XXII1.4 MW—
Kayseri solar project XXIII1.4 MW—
Kayseri solar project XXIV1.4 MW—
Kocaeli solar project X1.4 MW—
Konya solar project LXXX1.4 MW—
Konya solar project V1.4 MW—
Kütahya Merkez solar project VIII1.4 MW—
Kütahya solar project II1.4 MW—
Kütahya solar project IX1.4 MW—
Manisa solar project VIII1.4 MW—
Mardin solar project XIV1.4 MW—
Mersin solar project XVIII1.4 MW—
Muğla solar project XXIX1.4 MW—
Muğla solar project XXX1.4 MW—
Nevşehir solar project XXXV1.4 MW—
Nevşehir solar project XXXVI1.4 MW—
Samsun solar project IX1.4 MW—
Sivas Belediyesi Sivas solar project III1.4 MW—
Sivas solar project XXVII1.4 MW—
Türkiye solar project CCXCVII1.4 MW—
Türkiye solar project CCXL1.4 MW—
Türkiye solar project LXXXVII1.4 MW—
Uşak solar project XXVIII1.4 MW—
Yozgat solar project XXIII1.4 MW—
Çorum solar project IX1.4 MW—
Adana solar project XXIX1.3 MW—
Afyonkarahisar solar project XCV1.3 MW—
Afyonkarahisar solar project XXXI1.3 MW—
Amasya solar project II1.3 MW—
Amasya solar project XVII1.3 MW—
Antalya solar project III1.3 MW—
Antalya solar project LVIII1.3 MW—
Antalya solar project V1.3 MW—
Antalya solar project XLVII1.3 MW—
Balıkesir solar project XVIII1.3 MW—
Bitlis solar project VII1.3 MW—
Bursa solar project VII1.3 MW—
Bursa solar project XXXII1.3 MW—
Bursa solar project XXXIV1.3 MW—
Denizli solar project II1.3 MW—
Denizli solar project LIX1.3 MW—
Denizli solar project XII1.3 MW—
Denizli solar project XVII1.3 MW—
Denizli solar project XXXIX1.3 MW—
Diyarbakır solar project III1.3 MW—
Diyarbakır solar project XXVI1.3 MW—
Diyarbakır solar project XXXI1.3 MW—
Elazığ solar project XII1.3 MW—
Elâzığ solar project XIV1.3 MW—