←CapexAtlas|Directory
Directory · Spain

Energy assets in Spain

4,063 tracked assets, largest first. Country overview →

Spain generation mix by capacity

solar: 36.2 GW (29.4%)wind: 31.0 GW (25.1%)gas: 27.9 GW (22.6%)hydro: 16.3 GW (13.2%)nuclear: 7.4 GW (6.0%)oil: 3.4 GW (2.8%)Other: 1.1 GW (0.9%)123.4 GWtotal
  • solar36.2 GW29.4%
  • wind31.0 GW25.1%
  • gas27.9 GW22.6%
  • hydro16.3 GW13.2%
  • nuclear7.4 GW6.0%
  • oil3.4 GW2.8%
  • Other1.1 GW0.9%

Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.

Capacity built per year

BuiltUnder construction

123.4 GW operating across 4,065 tracked assets, 9.3 GW under construction · last five years up 6% on the five before.

1.83.65.47.2GW1990: 742 MW built1991: 96 MW built1992: 230 MW built1993: 21 MW built1994: 283 MW built1995: 278 MW built1996: 184 MW built1997: 591 MW built1998: 581 MW built1999: 615 MW built2000: 1.2 GW built2001: 1.5 GW built2002: 4.5 GW built2003: 4.6 GW built2004: 3.2 GW built2005: 6.6 GW built2006: 7.2 GW built2007: 5.7 GW built2008: 5.6 GW built2009: 2.8 GW built2010: 2.4 GW built2011: 2.9 GW built2012: 2.3 GW built2013: 1.4 GW built2014: 140 MW built2015: 94 MW built2016: 27 MW built2017: 3.9 GW built2018: 637 MW built2019: 4.8 GW built2020: 4.0 GW built2021: 4.6 GW built2022: 6.1 GW built2023: 6.4 GW built2024: 3.6 GW built2025: 3.0 GW built2026: 0 MW built2027: 921 MW under construction19901995200020052010201520202025
Cumulative operating capacity
GW58116
Hover a bar for the year.

Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 5.5 GW is under construction with no stated completion year. 7.9 GW of operating capacity has no commissioning year and sits outside the curve. 1 asset has an announced retirement date; closures are not otherwise tracked, so no net-capacity line is drawn.

85% of Spain’s tracked capacity has an owner recorded.

AssetCapacityOwner
Castile And León solar project CCLXI1 MW—
Castile And León solar project CCLXXIV1 MW—
Castile And León solar project CCXC1 MW—
Castile And León solar project CCXCIII1 MW—
Castile And León solar project CCXLIII1 MW—
Castile And León solar project CCXLVIII1 MW—
Castile And León solar project CCXVIII1 MW—
Castile And León solar project CCXXV1 MW—
Castile And León solar project CCXXX1 MW—
Castile And León solar project CLXXXI1 MW—
Castile And León solar project CLXXXII1 MW—
Castile And León solar project CLXXXVI1 MW—
Castile And León solar project CXCIII1 MW—
Castile And León solar project CXCV1 MW—
Castile-La Mancha solar project CCCII1 MW—
Castile-La Mancha solar project CCCVII1 MW—
Castile-La Mancha solar project CCCXLVII1 MW—
Castile-La Mancha solar project CCCXXXII1 MW—
Castile-La Mancha solar project CCLXXVIII1 MW—
Castile-La Mancha solar project CCXCIV1 MW—
Castile-La Mancha solar project CDI1 MW—
Castile-La Mancha solar project CDXII1 MW—
Community Of Madrid solar project X1 MW—
Cárcheles solar project1 MW—
El Andévalo solar project X1 MW—
El Bierzo solar project II1 MW—
Extremadura solar project CII1 MW—
Extremadura solar project CIX1 MW—
Garrotxa solar project1 MW—
Granada Partido Judicial De Granada solar project1 MW—
La Selva solar project IV1 MW—
Los Monegros solar project VI1 MW—
Menorca solar project VIII1 MW—
Montsià solar project IV1 MW—
Málaga Málaga-Costa Del Sol solar project III1 MW—
Noroeste solar project IX1 MW—
Northwest Coast solar project1 MW—
Oriental solar project IV1 MW—
Ourense solar project1 MW—
Peralta/Azkoien Erriberagoiena / Ribera Alta solar project1 MW—
Rioja solar project XXIII1 MW—
Santa Margalida Pla De Mallorca solar project1 MW—
Valdejalón solar project VIII1 MW—
Valencian Community solar project C1 MW—
Valencian Community solar project LII1 MW—
Valencian Community solar project LV1 MW—
Valencian Community solar project LXII1 MW—
Valencian Community solar project LXXIII1 MW—
Valencian Community solar project LXXXIV1 MW—
Valencian Community solar project XCI1 MW—
Valencian Community solar project XCV1 MW—
Valencian Community solar project XLVIII1 MW—
Valle Del Guadalhorce solar project I1 MW—
Vega Alta Del Segura solar project VI1 MW—
Vega Media Del Segura solar project III1 MW—
Zaragoza solar project XX1 MW—
Barcelona LNG Terminal—Enagás
Bilbao LNG Terminal—Enagás
Cartagena LNG Terminal (Spain)—Enagás
El Musel LNG Terminal—Enagás
Huelva LNG Terminal—Enagás
Mugardos LNG Terminal——
Sagunto LNG Terminal——