Directory · Latvia

Energy assets in Latvia

99 tracked assets, largest first. Country overview →

Latvia generation mix by capacity

hydro: 1.5 GW (46.1%)gas: 1.1 GW (32.6%)solar: 585 MW (17.6%)wind: 100 MW (3.0%)bioenergy: 23 MW (0.7%)3.3 GWtotal
  • hydro1.5 GW46.1%
  • gas1.1 GW32.6%
  • solar585 MW17.6%
  • wind100 MW3.0%
  • bioenergy23 MW0.7%

Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.

Capacity built per year

BuiltUnder construction

3.3 GW operating across 99 tracked assets, 225 MW under construction · last five years up 4400% on the five before.

0.10.20.30.5GW1990: 0 MW built1991: 0 MW built1992: 0 MW built1993: 0 MW built1994: 0 MW built1995: 0 MW built1996: 0 MW built1997: 0 MW built1998: 0 MW built1999: 0 MW built2000: 0 MW built2001: 0 MW built2002: 20 MW built2003: 0 MW built2004: 0 MW built2005: 158 MW built2006: 48 MW built2007: 0 MW built2008: 0 MW built2009: 441 MW built2010: 0 MW built2011: 0 MW built2012: 21 MW built2013: 463 MW built2014: 0 MW built2015: 0 MW built2016: 0 MW built2017: 12 MW built2018: 2 MW built2019: 0 MW built2020: 0 MW built2021: 0 MW built2022: 63 MW built2023: 111 MW built2024: 200 MW built2025: 256 MW built2026: 0 MW built19901995200020052010201520202025
Cumulative operating capacity
GW23
Hover a bar for the year.

Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 225 MW is under construction with no stated completion year. Retirements are not tracked for this country, so no net-capacity line is drawn.

90% of Latvia’s tracked capacity has an owner recorded.

AssetCapacityOwner
Plavinas hydroelectric plant894 MWLatvenergo
Riga-2 power station441 MWLatvenergo
Riga-2 power station440 MWLatvenergo
Riga hydroelectric plant402 MWLatvenergo
Kegums hydroelectric plant240 MWLatvenergo
Riga-1 power station158 MWLatvenergo
Vārme solar farm94 MWUAB Ignitis Renewables
Dagda solar farm90 MWSunly
Barkava 2 solar farm81 MWSunly
Stelpe solar farm72.5 MWUAB Ignitis Renewables
Stelpe solar farm72.5 MWUAB Ignitis Renewables
Targale wind farm59 MWUtilitas OÜ
Matīši solar farm54 MWSunly
Imanta power station48 MWRigas Siltums
Gren Jelgava power station23 MWGren
Pope wind farm21 MWWinergy SIA
Grobina wind farm20 MWUtilitas OÜ
Smiltenes Pagasts solar project16.9 MW—
Priekuļu Pagasts solar project13.7 MW—
Nīcas Pagasts solar project II11.4 MW—
Riga solar project II10.4 MW—
Kalkūnes Pagasts solar project10 MW—
Salaspils Pagasts solar project8.3 MW—
Sēlpils Pagasts solar project I8.3 MW—
Carnikavas Pagasts solar project II7.6 MW—
Latvia solar project VI7.3 MW—
Stelpes Pagasts solar project7.3 MW—
Lībagu Pagasts solar project7.2 MW—
Priekules Pagasts solar project6.8 MW—
Kauguru Pagasts Valmieras Novads solar project6.7 MW—
Kandavas Pagasts Tukuma Novads solar project6.6 MW—
Iecavas Pagasts Bauskas Novads solar project6.2 MW—
Platones Pagasts solar project6.2 MW—
Bērzes Pagasts solar project6 MW—
Latvia solar project II6 MW—
Olaines Pagasts solar project II6 MW—
Latvia solar project IV5.8 MW—
Raņķu Pagasts solar project5.8 MW—
Carnikavas Pagasts solar project I5.3 MW—
Codes Pagasts solar project I5.3 MW—
Aizkraukles Pagasts solar project IV5.2 MW—
Brenguļu Pagasts Valmieras Novads solar project5.1 MW—
Bārbeles Pagasts solar project5.1 MW—
Daugavpils solar project II5 MW—
Nīcas Pagasts solar project I4.8 MW—
Salaspils Novads solar project4.7 MW—
Talsu Novads solar project4.7 MW—
Valmiera solar project4.6 MW—
Kokneses Pagasts solar project4.4 MW—
Skultes Pagasts solar project4.3 MW—
Tomes Pagasts solar project4.3 MW—
Elejas Pagasts solar project4.2 MW—
Dundagas Pagasts solar project4.1 MW—
Jelgavas Novads solar project4.1 MW—
Sērenes Pagasts solar project3.5 MW—
Jeru Pagasts solar project3.4 MW—
Tabores Pagasts solar project3.4 MW—
Aizkraukles Pagasts solar project I3.3 MW—
Smārdes Pagasts solar project3.3 MW—
Tērvetes Pagasts Dobeles Novads solar project3.3 MW—
Zaļesjes Pagasts solar project3.2 MW—
Aizkraukles Pagasts solar project III3.1 MW—
Dobeles Novads solar project3.1 MW—
Bikstu Pagasts solar project3 MW—
Iecavas Pagasts solar project I3 MW—
Inčukalna Pagasts solar project2.9 MW—
Ogresgala Pagasts solar project2.9 MW—
Jūrmala solar project I2.8 MW—
Riga solar project I2.6 MW—
Kūku Pagasts solar project2.5 MW—
Codes Pagasts solar project II2.4 MW—
Svētes Pagasts solar project I2.4 MW—
Aiviekstes Pagasts solar project2.3 MW—
Aizkraukles Pagasts solar project II2.2 MW—
Latvia solar project III2.2 MW—
Ogres Novads solar project2.2 MW—
Vērēmu Pagasts solar project2.2 MW—
Lendžu Pagasts solar project2.1 MW—
Mežotnes Pagasts solar project2.1 MW—
Jelgava solar project2 MW—
Daugavpils solar project I1.9 MW—
Iecavas Pagasts solar project II1.9 MW—
Latvia solar project V1.8 MW—
Ozolmuižas Pagasts solar project1.8 MW—
Saukas Pagasts solar project1.8 MW—
Latvia solar project I1.7 MW—
Latvia solar project VII1.7 MW—
Tārgales Pagasts solar project1.7 MW—
Alojas Pagasts solar project1.5 MW—
Jūrmala solar project II1.5 MW—
Sēlpils Pagasts solar project II1.5 MW—
Birzgales Pagasts solar project1.4 MW—
Glūdas Pagasts solar project1.4 MW—
Svētes Pagasts solar project II1.4 MW—
Kocēnu Pagasts solar project1.3 MW—
Olaines Pagasts solar project I1.3 MW—
Stopiņu Pagasts solar project1.3 MW—
Ķekava solar project1.2 MW—
Ropažu Pagasts solar project1.1 MW—
Latvia energy assets · CapexAtlas