Directory · Kosovo
Energy assets in Kosovo
12 tracked assets, largest first. Country overview →
Kosovo generation mix by capacity
- coal1.3 GW87.6%
- wind135 MW8.9%
- hydro35 MW2.3%
- solar17 MW1.1%
Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.
Capacity built per year
BuiltUnder construction
1.5 GW operating across 12 tracked assets, 150 MW under construction · last five years down 98% on the five before.
Cumulative operating capacity
Hover a bar for the year.
Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. 1 asset has an announced retirement date; closures are not otherwise tracked, so no net-capacity line is drawn.
97% of Kosovo’s tracked capacity has an owner recorded.
| Asset | Capacity | Owner |
|---|---|---|
| Kosovo B power station | 375 MW | Korporata Energjetike e Kosovës |
| Kosovo B power station | 340 MW | Korporata Energjetike e Kosovës |
| Kosovo A power station | 210 MW | Korporata Energjetike e Kosovës |
| Kosovo A power station | 200 MW | Korporata Energjetike e Kosovës |
| Kosovo A power station | 200 MW | Korporata Energjetike e Kosovës |
| Gjakova solar farm | 150 MW | Solar Energy Group Europe |
| Bajgora wind farm | 103 MW | Enlight Renewable Energy |
| Ujmani hydroelectric plant | 35 MW | — |
| Kitka wind farm | 32 MW | Air Energy |
| Kosovo solar project II | 10.6 MW | — |
| Kosovo solar project I | 3.5 MW | — |
| Kosovo solar project III | 2.8 MW | — |