Schacht Konrad wind farm is a wind farm in Germany with a capacity of 42 MW, commissioned in 2025. It is operating.
In 2024 it settled 10.6 GWh of electricity, a load factor of 2.9%. Part of that volume was sold outside EEG support, so it is partly merchant.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets