Solar farm

Am Stocket solar project

Am Stocket solar project is a solar farm in Germany with a capacity of 2.3 MW, commissioned in 2024. It is operating and is owned by Blenninger eGbR.

In 2024 it settled 830 MWh of electricity, a load factor of 4.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2044, after which that output is sold at market prices.

Peer comparison unavailable

Commissioned 2024, settled 2024 — a partial year of output over a full year of nameplate. Not comparable.

Capacity
2.3 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Blenninger eGbR
Technology
PV
Measured output 2024
830 MWh
Load factor
4.1%
EEG support ends
2044
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap