Solar farm

Halle 611 solar project

Halle 611 solar project is a solar farm in Germany with a capacity of 1.6 MW, commissioned in 2024. It is operating and is owned by ITC Industrie und Technologiepark HECKERT GmbH Chemnitz.

In 2024 it settled 492 MWh of electricity, a load factor of 3.5%. It sold essentially all of that volume outside EEG support — it is already merchant.

Peer comparison unavailable

Commissioned 2024, settled 2024 — a partial year of output over a full year of nameplate. Not comparable.

Capacity
1.6 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
ITC Industrie und Technologiepark HECKERT GmbH Chemnitz
Technology
PV
Measured output 2024
492 MWh
Load factor
3.5%
Grid connection
MS
State
Sachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE940085529310); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap