Solar farm

Solarpark Beetzendorf Teilanlage 4 solar project

Solarpark Beetzendorf Teilanlage 4 solar project is a solar farm in Germany with a capacity of 1.2 MW, commissioned in 2020. It is operating.

In 2024 it settled 778 MWh of electricity, a load factor of 7.4%. That volume was settled under EEG support.

Capacity
1.2 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Technology
PV
Measured output 2024
778 MWh
Load factor
7.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap