Solar farm

PVA Emmingen Liptingen solar project

PVA Emmingen Liptingen solar project is a solar farm in Germany with a capacity of 17.3 MW, commissioned in 2023. It is operating and is owned by EnBW Solar GmbH.

In 2024 it settled 17.5 GWh of electricity, a load factor of 11.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
11.6%
This assetCohort median 9.7%Middle half

This asset produced at 11.6% of nameplate in 2024 — the 87th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
17.3 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
EnBW Solar GmbH
Technology
PV
Measured output 2024
17.5 GWh
Load factor
11.6%
EEG support ends
2043
Peer percentile
87th
Grid connection
MS
State
Baden-Württemberg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE917366059750); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets