Solar farm

PV Anlage Ostendorf Werk 2 solar project

PV Anlage Ostendorf Werk 2 solar project is a solar farm in Germany with a capacity of 1.9 MW, commissioned in 2023. It is operating.

In 2024 it settled 49 MWh of electricity, a load factor of 0.3%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
1.9 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Technology
PV
Measured output 2024
49 MWh
Load factor
0.3%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets