Solar farm

PV Anlage Industriedach Bauabschnitt 1 solar project

PV Anlage Industriedach Bauabschnitt 1 solar project is a solar farm in Germany with a capacity of 1.5 MW, commissioned in 2023. It is operating and is owned by Husumer Mineralbrunnen HMB GmbH.

In 2024 it settled 178 MWh of electricity, a load factor of 1.4%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
1.4%
This assetCohort median 9.7%Middle half

This asset produced at 1.4% of nameplate in 2024 — the 4th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
1.5 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Husumer Mineralbrunnen HMB GmbH
Technology
PV
Measured output 2024
178 MWh
Load factor
1.4%
Peer percentile
4th
Grid connection
MS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE906845172813); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets