Solar farm

KTO Koblenz solar project

KTO Koblenz solar project is a solar farm in Germany with a capacity of 1.6 MW, commissioned in 2023. It is operating.

In 2024 it settled 868 MWh of electricity, a load factor of 6.2%. That volume was settled under EEG support.

Capacity
1.6 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Technology
PV
Measured output 2024
868 MWh
Load factor
6.2%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap