Solar farm

Krempe solar farm

Krempe solar farm is a solar farm in Germany with a capacity of 19 MW, commissioned in 2023. It is operating and is owned by Solarpark Krempe GmbH & Co. KG.

In 2024 it settled 282 MWh of electricity, a load factor of 0.2%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
0.2%
This assetCohort median 9.7%Middle half

This asset produced at 0.2% of nameplate in 2024 — the 1st percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
19 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Solarpark Krempe GmbH & Co. KG
Technology
PV
Measured output 2024
282 MWh
Load factor
0.2%
EEG support ends
2043
Peer percentile
1st
Grid connection
HS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE920590508857); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap