Solar farm

Grolsheim DC2 solar project

Grolsheim DC2 solar project is a solar farm in Germany with a capacity of 2.1 MW, commissioned in 2024. It is operating.

In 2024 it settled 1.3 GWh of electricity, a load factor of 7.2%. That volume was settled under EEG support.

Capacity
2.1 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Technology
PV
Measured output 2024
1.3 GWh
Load factor
7.2%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap