Wind farm

Sipsdorf wind farm

Sipsdorf wind farm is a wind farm in Germany with a capacity of 46 MW, commissioned in 2023. It is operating and is owned by Windpark Sipsdorf GmbH & Co. KG.

In 2024 it settled 74.8 GWh of electricity, a load factor of 18.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, with later phases to 2044, after which that output is sold at market prices.

Measured performance vs peers
18.6%
This assetCohort median 23.8%Middle half

This asset produced at 18.6% of nameplate in 2024 — the 20th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
46 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Windpark Sipsdorf GmbH & Co. KG
Technology
Onshore
Measured output 2024
74.8 GWh
Load factor
18.6%
EEG support ends
2043
Peer percentile
20th
Grid connection
HS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE908910408261); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets