Wind farm

Saerbeck wind farm

Saerbeck wind farm is a wind farm in Germany with a capacity of 18 MW, commissioned in 2018. It is operating.

In 2024 it settled 36.0 GWh of electricity, a load factor of 22.8%. Part of that volume was sold outside EEG support, so it is partly merchant.

Capacity
18 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
Technology
Onshore
Measured output 2024
36.0 GWh
Load factor
22.8%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap