Wind farm

Ostprignitz wind farm

Ostprignitz wind farm is a wind farm in Germany with a capacity of 50 MW, commissioned in 2024. It is operating.

In 2024 it settled 12.5 GWh of electricity, a load factor of 2.9%. That volume was settled under EEG support.

Capacity
50 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Technology
Onshore
Measured output 2024
12.5 GWh
Load factor
2.9%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap