Wind farm

Nordermeldorf wind farm

Nordermeldorf wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2023. It is operating and is owned by Nordermeldorf-Wind GmbH & Co. KG.

In 2024 it settled 3.2 GWh of electricity, a load factor of 3.6%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
3.6%
This assetCohort median 23.8%Middle half

This asset produced at 3.6% of nameplate in 2024 — the 1st percentile of German wind commissioned 2020 or later (140 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Nordermeldorf-Wind GmbH & Co. KG
Technology
Onshore
Measured output 2024
3.2 GWh
Load factor
3.6%
EEG support ends
2043
Peer percentile
1st
Grid connection
HS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE956622405849); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets