Wind farm

Krampfer-Reckenthin (Groß Pankow) wind farm

Krampfer-Reckenthin (Groß Pankow) wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2021. It is operating.

In 2024 it settled 14.3 GWh of electricity, a load factor of 11.7%. That volume was settled under EEG support.

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
Technology
Onshore
Measured output 2024
14.3 GWh
Load factor
11.7%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap