Wind farm

Krampfer-Reckenthin (Groß Pankow) wind farm

Krampfer-Reckenthin (Groß Pankow) wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2021. It is operating and is owned by Windpark Krampfer-Reckenthin die Zweite GmbH&Co. KG.

In 2024 it settled 14.3 GWh of electricity, a load factor of 11.7%. That volume was settled under EEG support.

Its EEG support ran to the end of 2022.

Measured performance vs peers
11.7%
This assetCohort median 23.8%Middle half

This asset produced at 11.7% of nameplate in 2024 — the 6th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
Windpark Krampfer-Reckenthin die Zweite GmbH&Co. KG
Technology
Onshore
Measured output 2024
14.3 GWh
Load factor
11.7%
EEG support ends
2022
Peer percentile
6th
Grid connection
MS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE943597990197); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets