Horbach wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2018. It is operating and is owned by ABO Wind AG.
In 2024 it settled 26.5 GWh of electricity, a load factor of 30.2%. That volume was settled under EEG support.
Its EEG support runs to the end of 2033, with later phases to 2038, after which that output is sold at market prices.
This asset produced at 30.2% of nameplate in 2024 — the 87th percentile of German wind commissioned 2015-2019 (215 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against abo-wind.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets