Hakenberg wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2016. It is operating and is owned by Stadtwerke Lichtenau GmbH.

In 2024 it settled 30.5 GWh of electricity, a load factor of 23.2%. That volume was settled under EEG support.

Its EEG support runs to the end of 2036, after which that output is sold at market prices.

Measured performance vs peers
23.2%
This assetCohort median 24.7%Middle half

This asset produced at 23.2% of nameplate in 2024 — the 38th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
Stadtwerke Lichtenau GmbH
Technology
Onshore
Measured output 2024
30.5 GWh
Load factor
23.2%
EEG support ends
2036
Peer percentile
38th
Grid connection
MS
State
Nordrhein-Westfalen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE972044876562); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets