Kohldamm wind farm is a wind farm in Germany with a capacity of 33 MW, commissioned in 2014. It is operating and is owned by Windpark Kohldamm GmbH & Co. KG.
In 2024 it settled 49.5 GWh of electricity, a load factor of 17.1%. Part of that volume was sold outside EEG support, so it is partly merchant.
Its EEG support runs to the end of 2034, after which that output is sold at market prices.
This asset produced at 17.1% of nameplate in 2024 — the 13th percentile of German wind commissioned 2010-2014 (128 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE943949252744); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets