Hanstedt-Wriedel wind farm is a wind farm in Germany with a capacity of 32 MW, commissioned in 2021. It is operating and is owned by Energiepark Hanstedt-Erweiterung WP HEW GmbH & Co. KG.
In 2024 it settled 54.2 GWh of electricity, a load factor of 19.3%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.
Its EEG support ran to the end of 2021.
This asset produced at 19.3% of nameplate in 2024 — the 24th percentile of German wind commissioned 2020 or later (140 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE909168449525); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets