Wind farm

Siestedt wind farm

Siestedt wind farm is a wind farm in Germany with a capacity of 30 MW, commissioned in 2008. It is operating and is owned by Windpark Siestedt V GmbH & Co. KG.

In 2024 it settled 40.1 GWh of electricity, a load factor of 15.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2027, with later phases to 2028, after which that output is sold at market prices.

Measured performance vs peers
15.3%
This assetCohort median 16.3%Middle half

This asset produced at 15.3% of nameplate in 2024 — the 41st percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
30 MW
Country
Germany
Status
operating
Commissioned
2008
Owner
Windpark Siestedt V GmbH & Co. KG
Technology
Onshore
Measured output 2024
40.1 GWh
Load factor
15.3%
EEG support ends
2027
Peer percentile
41st
Grid connection
MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE984939540960); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets