Wind farm

Neuharlingersiel-Werdum wind farm

Neuharlingersiel-Werdum wind farm is a wind farm in Germany with a capacity of 30 MW, commissioned in 2013. It is operating and is owned by NEUH-WERD Energie GmbH & Co. KG.

In 2024 it settled 47.4 GWh of electricity, a load factor of 18.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2033, with later phases to 2034, after which that output is sold at market prices.

Measured performance vs peers
18.0%
This assetCohort median 21.9%Middle half

This asset produced at 18.0% of nameplate in 2024 — the 19th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
30 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
NEUH-WERD Energie GmbH & Co. KG
Technology
Onshore
Measured output 2024
47.4 GWh
Load factor
18.0%
EEG support ends
2033
Peer percentile
19th
Grid connection
HS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE976950352783); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets