Wind farm

Balkum-Thiene wind farm

Balkum-Thiene wind farm is a wind farm in Germany with a capacity of 28 MW, commissioned in 2007. It is operating and is owned by WPD AG.

In 2024 it settled 31.9 GWh of electricity, a load factor of 13.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2027, after which that output is sold at market prices.

Measured performance vs peers
13.0%
This assetCohort median 16.3%Middle half

This asset produced at 13.0% of nameplate in 2024 — the 28th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
28 MW
Country
Germany
Status
operating
Commissioned
2007
Owner
WPD AGresearched
Technology
Onshore
Measured output 2024
31.9 GWh
Load factor
13.0%
EEG support ends
2027
Peer percentile
28th
Grid connection
MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against wpd.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets