Wind farm

Eckolstädt wind farm

Eckolstädt wind farm is a wind farm in Germany with a capacity of 26 MW, commissioned in 2012. It is operating and is owned by Windpark Eckolstädt II GmbH & Co. KG.

In 2024 it settled 40.8 GWh of electricity, a load factor of 17.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2032, with later phases to 2038, after which that output is sold at market prices.

Measured performance vs peers
17.9%
This assetCohort median 21.9%Middle half

This asset produced at 17.9% of nameplate in 2024 — the 16th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
26 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
Windpark Eckolstädt II GmbH & Co. KG
Technology
Onshore
Measured output 2024
40.8 GWh
Load factor
17.9%
EEG support ends
2032
Peer percentile
16th
Grid connection
HS
State
Thüringen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE959097481714); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap