Wind farm

Biere (WPD) wind farm

Biere (WPD) wind farm is a wind farm in Germany with a capacity of 24 MW, commissioned in 2002. It is operating and is owned by Windpark Biere II GmbH & Co. KG Renditefonds.

In 2024 it settled 43.3 GWh of electricity, a load factor of 20.6%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
20.6%
This assetCohort median 16.3%Middle half

This asset produced at 20.6% of nameplate in 2024 — the 79th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
24 MW
Country
Germany
Status
operating
Commissioned
2002
Owner
Windpark Biere II GmbH & Co. KG Renditefonds
Technology
Onshore
Measured output 2024
43.3 GWh
Load factor
20.6%
Peer percentile
79th
Grid connection
HS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE970426224215); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets