Wind farm

Monschau wind farm

Monschau wind farm is a wind farm in Germany with a capacity of 23 MW, commissioned in 2003. It is operating and is owned by Alterric Windpark GmbH & Co. Passat I KG.

In 2024 it settled 11.1 GWh of electricity, a load factor of 5.5%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
5.5%
This assetCohort median 16.3%Middle half

This asset produced at 5.5% of nameplate in 2024 — the 2nd percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
23 MW
Country
Germany
Status
operating
Commissioned
2003
Owner
Alterric Windpark GmbH & Co. Passat I KG
Technology
Onshore
Measured output 2024
11.1 GWh
Load factor
5.5%
Peer percentile
2nd
Grid connection
HS/MS
State
Nordrhein-Westfalen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE983087982196); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap