Wind farm

Niederwerbig wind farm

Niederwerbig wind farm is a wind farm in Germany with a capacity of 24 MW, commissioned in 2021. It is operating.

In 2024 it settled 35.6 GWh of electricity, a load factor of 16.9%. Part of that volume was sold outside EEG support, so it is partly merchant.

Capacity
24 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
Technology
Onshore
Measured output 2024
35.6 GWh
Load factor
16.9%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap