Wind farm

Greifenhain wind farm

Greifenhain wind farm is a wind farm in Germany with a capacity of 20 MW, commissioned in 2010. It is operating and is owned by Windpark Greifenhain GmbH & Co. KG.

In 2024 it settled 30.7 GWh of electricity, a load factor of 17.5%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, with later phases to 2030, after which that output is sold at market prices.

Measured performance vs peers
17.5%
This assetCohort median 21.9%Middle half

This asset produced at 17.5% of nameplate in 2024 — the 15th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
20 MW
Country
Germany
Status
operating
Commissioned
2010
Owner
Windpark Greifenhain GmbH & Co. KG
Technology
Onshore
Measured output 2024
30.7 GWh
Load factor
17.5%
EEG support ends
2029
Peer percentile
15th
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE919032494308); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets