Iversacker wind farm is a wind farm in Germany with a capacity of 19 MW, commissioned in 2022. It is operating and is owned by Windpark Iversacker.
In 2024 it settled 17.9 GWh of electricity, a load factor of 10.7%. That volume was settled under EEG support.
Its EEG support runs to the end of 2042, with later phases to 2044, after which that output is sold at market prices.
This asset produced at 10.7% of nameplate in 2024 — the 5th percentile of German wind commissioned 2020 or later (140 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE939041142922); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets