Kötzlin-Barenthin wind farm is a wind farm in Germany with a capacity of 18 MW, commissioned in 2002. It is operating and is owned by Windpark Fonds Kötzlin-Barenthin GmbH & Co. KG.

In 2024 it settled 11.8 GWh of electricity, a load factor of 7.5%. It sold essentially all of that volume outside EEG support — it is already merchant. This figure is apportioned across units of the same site that share a registry entry.

Measured performance vs peers
7.5%
This assetCohort median 16.3%Middle half

This asset produced at 7.5% of nameplate in 2024 — the 3rd percentile of German wind commissioned pre-2010 (182 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.

Capacity
18 MW
Country
Germany
Status
operating
Commissioned
2002
Owner
Windpark Fonds Kötzlin-Barenthin GmbH & Co. KG
Technology
Onshore
Measured output 2024
11.8 GWh
Load factor
7.5%
Peer percentile
3rd
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE907740482564); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets