Grabow-Reesen wind farm is a wind farm in Germany with a capacity of 18 MW, commissioned in 2014. It is operating and is owned by Windpark GmbH & Co. Grabow-Reesen KG.
In 2024 it settled 38.8 GWh of electricity, a load factor of 24.6%. That volume was settled under EEG support.
Its EEG support runs to the end of 2034, after which that output is sold at market prices.
This asset produced at 24.6% of nameplate in 2024 — the 70th percentile of German wind commissioned 2010-2014 (128 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE982146826297); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets