Puls wind farm is a wind farm in Germany with a capacity of 17 MW, commissioned in 1999. It is operating and is owned by PNE AG.
In 2024 it settled 5.5 GWh of electricity, a load factor of 3.7%. Part of that volume was sold outside EEG support, so it is partly merchant.
Its EEG support ran to the end of 2019.
This asset produced at 3.7% of nameplate in 2024 — the 1st percentile of German wind commissioned pre-2010 (182 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against pne-ag.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets