Wind farm

Medow wind farm

Medow wind farm is a wind farm in Germany with a capacity of 16 MW, commissioned in 2006. It is operating and is owned by Windpark Medow Erste Betriebs GmbH & Co. KG.

In 2024 it settled 33.4 GWh of electricity, a load factor of 23.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2026, after which that output is sold at market prices.

Measured performance vs peers
23.8%
This assetCohort median 16.3%Middle half

This asset produced at 23.8% of nameplate in 2024 — the 88th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
16 MW
Country
Germany
Status
operating
Commissioned
2006
Owner
Windpark Medow Erste Betriebs GmbH & Co. KG
Technology
Onshore
Measured output 2024
33.4 GWh
Load factor
23.8%
EEG support ends
2026
Peer percentile
88th
Grid connection
HS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE953726266154); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap