Wind farm

Aller-Leine-Tal wind farm

Aller-Leine-Tal wind farm is a wind farm in Germany with a capacity of 16 MW, commissioned in 2012. It is operating and is owned by Windpark Aller-Leine-Tal GmbH & Co. KG.

In 2024 it settled 27.0 GWh of electricity, a load factor of 19.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2031, with later phases to 2032, after which that output is sold at market prices.

Measured performance vs peers
19.3%
This assetCohort median 21.9%Middle half

This asset produced at 19.3% of nameplate in 2024 — the 27th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
16 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
Windpark Aller-Leine-Tal GmbH & Co. KG
Technology
Onshore
Measured output 2024
27.0 GWh
Load factor
19.3%
EEG support ends
2031
Peer percentile
27th
Grid connection
HS/MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE981040178945); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets