Wind farm

Schiffweiler wind farm

Schiffweiler wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2014. It is operating and is owned by Neustromland Energieprojekt 2.

In 2024 it settled 32.5 GWh of electricity, a load factor of 24.7%. Part of that volume was sold outside EEG support, so it is partly merchant.

Its EEG support runs to the end of 2034, with later phases to 2041, after which that output is sold at market prices.

Measured performance vs peers
24.7%
This assetCohort median 21.9%Middle half

This asset produced at 24.7% of nameplate in 2024 — the 70th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2014
Owner
Neustromland Energieprojekt 2
Technology
Onshore
Measured output 2024
32.5 GWh
Load factor
24.7%
EEG support ends
2034
Peer percentile
70th
Grid connection
HS
State
Saarland

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE972631541279); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets