Rohrberg wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2016. It is operating and is owned by Städtische Werke AG.
In 2024 it settled 44.0 GWh of electricity, a load factor of 33.5%. That volume was settled under EEG support.
Its EEG support runs to the end of 2035, with later phases to 2036, after which that output is sold at market prices.
This asset produced at 33.5% of nameplate in 2024 — the 97th percentile of German wind commissioned 2015-2019 (215 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against opendata-esri-de.opendata.arcgis.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets