Wind farm

Retzstadt wind farm

Retzstadt wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2014. It is operating and is owned by Bürgerwindenergie Retzstadt GmbH & Co. KG.

In 2024 it settled 29.6 GWh of electricity, a load factor of 22.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2034, with later phases to 2035, after which that output is sold at market prices.

Measured performance vs peers
22.6%
This assetCohort median 21.9%Middle half

This asset produced at 22.6% of nameplate in 2024 — the 58th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2014
Owner
Bürgerwindenergie Retzstadt GmbH & Co. KG
Technology
Onshore
Measured output 2024
29.6 GWh
Load factor
22.6%
EEG support ends
2034
Peer percentile
58th
Grid connection
HS/MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE932549993287); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets