Rauschenberg wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2017. It is operating and is owned by Windpark Rauschenberg.
In 2024 it settled 29.6 GWh of electricity, a load factor of 22.5%. That volume was settled under EEG support.
Its EEG support runs to the end of 2037, after which that output is sold at market prices.
This asset produced at 22.5% of nameplate in 2024 — the 31st percentile of German wind commissioned 2015-2019 (215 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE969427027512); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets