Wind farm

Parstein-Lüdersdorf wind farm

Parstein-Lüdersdorf wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2003. It is operating and is owned by HelveticWind Lüdersdorf Parstein GmbH.

In 2024 it settled 24.5 GWh of electricity, a load factor of 18.6%. Part of that volume was sold outside EEG support, so it is partly merchant.

Its EEG support ran to the end of 2023.

Measured performance vs peers
18.6%
This assetCohort median 16.3%Middle half

This asset produced at 18.6% of nameplate in 2024 — the 65th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2003
Owner
HelveticWind Lüdersdorf Parstein GmbH
Technology
Onshore
Measured output 2024
24.5 GWh
Load factor
18.6%
EEG support ends
2023
Peer percentile
65th
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE941504296356); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap