Wind farm

Monschau-Höfener Wald wind farm

Monschau-Höfener Wald wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2018. It is operating and is owned by Windpark Monschau GmbH & Co. KG.

In 2024 it settled 46.0 GWh of electricity, a load factor of 35.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2037, with later phases to 2038, after which that output is sold at market prices.

Measured performance vs peers
35.0%
This assetCohort median 24.7%Middle half

This asset produced at 35.0% of nameplate in 2024 — the 97th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
Windpark Monschau GmbH & Co. KG
Technology
Onshore
Measured output 2024
46.0 GWh
Load factor
35.0%
EEG support ends
2037
Peer percentile
97th
Grid connection
HS/MS
State
Nordrhein-Westfalen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE913696566272); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap