Wind farm

Waldfeucht Energy Park wind farm

Waldfeucht Energy Park wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2020. It is operating and is owned by CEE Group.

In 2024 it settled 33.5 GWh of electricity, a load factor of 27.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2040, after which that output is sold at market prices.

Measured performance vs peers
27.3%
This assetCohort median 23.8%Middle half

This asset produced at 27.3% of nameplate in 2024 — the 71st percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
CEE Groupresearched
Technology
Onshore
Measured output 2024
33.5 GWh
Load factor
27.3%
EEG support ends
2040
Peer percentile
71st
Grid connection
MS
State
Nordrhein-Westfalen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against cee-group.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets